Prime 2 Zurich
Prime 2 - these are approx. 18,000 m2 of prestigious office space on the Welti Furrer AG site in the centre of Zurich, which is being transformed into a modern urban quarter. From the outside, recessed windows and deep stone reveals give the facade a formulated plasticity. Lenzlinger Sons Ltd. installed a total amount of 17,500m2 access floors and laid approx. 12,000m2 of flooring.
Work performed:
Access floors with carpet
The main part of the area was covered with textile flooring. The advantage is that these have a very high load-bearing capacity, are absolutely cut-resistant and the basic fabric is such that this covering cannot disintegrate in the edge area due to the impact of chair castors.
Access floors with ceramic tiles
In the reception area and on the staircases, ceramic tiles were used, which are easy to care for and maintain, but were perfectly integrated into the noble architecture. All in one piece and yet with the possibility of floor sockets for easy access to the power supply.
Access floors with parquet flooring
In the meeting rooms and the catering area, an oasis of well-being was created as the centrepiece under the atrium. This warmth could only be achieved with a construction of access floors in combination with a parquet surface.
Interior design:
GLAESER PROJEKT AG, Baden
Architecture:
Emch+Berger ImmoConsult AG, Basel
Client:
Deloitte AG, Zürich
© Pictures:
All photos courtesy of Deloitte AG and GLAESER PROJEKT AG.